10 Year Parts / 1 Year on Labor Will make all transitions as needed keep disconnect with make modifications on the pan. Current customer is not on a flood zone. We will use the supply and return and their air handler. Make sure we vacuum the system and make all proper adjustments. Level the system I’ll make sure they all free on levels are actually adjusted. We have to use a flush since this is R22 system.