Today I arrived on site and performed a winter time maintenance on your HVAC equipment. Here's a summary of the work completed: Filtration: Replaced the pleated 1" filter (20x20x1) with a spare provided by the customer. Electrical Components (Tested & Working): Verified proper operation and amperage within manufacturer specifications for: Blower Motor Heat Strip Kit Condenser Fan Motor Compressor Blower Run Capacitor Compressor Run Capacitor Fan Run Capacitor Compressor Start Capacitor Contactor Electrical Wiring System Components (Inspected & Working): Confirmed good condition and proper operation of: Blower Wheel Primary Drain Pan Electrical Wires Secured Ductwork Condensate Drain System: Cleared the drain line and tested the safety switch. Confirmed the drain line is strapped and secured. Temperature Readings: Return Air Temperature: 78.0 Degrees Fahrenheit Supply Air Temperature: 129.5 Degrees Fahrenheit Final Steps: Restored power to the units. Tested thermostat operation.