Today I arrived on site and performed a winter time maintenance on your HVAC equipment. **Indoor Unit (Air Handler):** * Located in the closet, servicing the whole home. * Observed the indoor coil in fair condition. * Verified filter size: 25x25x1, using an antimicrobial filter. **Outdoor Unit (Heat Pump):** * Located on the side of the house. * Observed the outdoor coil in fair condition. **Electrical Components (Tested and Working):** * Blower motor, heat strip kit, compressor, blower run capacitor, compressor run capacitor, fan run capacitor, contactor, and electrical wiring are all working within manufacturer specifications. **Components Inspected (Good Condition):** * Blower wheel, secondary drain pan, primary drain pan, and electrical wires are secured and in good working order. **Condensate Drain System:** * Cleared the drain line and tested the safety switch. * Confirmed the drain line is strapped down. **Temperature Readings:** * Return air temp