Upon my arrival I evaluated 2 furnace systems. I verified system safety and performance is to manufacture specifications. Flushed and treated the water removal system. Cleaned the electrical cabinet and washed unit using water. Found the pressures low for the downstairs unit, . Recommended a leak search, Carl chose to only add r410a at this time. I added 4LB’s.