Performed installation of factory specified compressor and thermostatic expansion valve. Installed new filter dryer at condenser. Performed system vacuum to 700 µm and recharged system to specs with R410a. Washed down condenser coil and obtain 17° temperature differential. Unit is operating to manufacture specifications at this time.