Upon my arrival I performed the approved repairs in the upgrading power protection and the air circulation system renovation. On both systems I installed new power protection, pulled the air movement system to break down for chemical cleaning. After cleaning was performed and air movement system dried out I installed it back into the system then ran a performance and safety testing on both systems finding everything is operating within manufacture specifications at this time.