Upon my arrival performed a HK2B and a HN13C. Performed a heat transfer media system cleaning added a safety water overflow switch and a p-trap. Replaced bad voltage enhancement system and the performance enhancement system. Checked operations and found equipment to be operating properly at this time, the system came down from 14.6 amps to 7.2A now that it’s working properly.