Today I arrived and met with Mike. I completed the fall evaluation today. I washed outdoor units using water and treated indoor water removal systems. I verified systems are safely operating and verified performance of each units as well. Currently units are both in need of indoor cleanings as there’s signs of bacteria inside both systems, growing on the air movement system causing potential stress to the operation and impeding air flow. Outdoor unit on the kitchen side has a voltage enhancement system that is out of its tolerance threshold, I brought these concerns up to Mike and he asked me to just email pricing. Upon departure left the front unit set for 72 heating and kitchen side unit 73 heating.