Arrived to site and replaced improperly installed water removal system. Put vent after the P trap. Added a union for easy clean out in the future. Glued all connections and insulated whole line with armaflex and tape. Tested water safety switches and chemically treated new water removal system line with pan treatment spray. Washed down condenser with water. Was very dirty on the back side with yard clipping. Tested system in cooling, system operating and draining to manufactures specifications at this time.