Replaced evaporator coil. Relocated condenser to wall bracket. Reflared and torqued down lineset. Cleaned outdoor coil. Pressure tested lineset with nitrogen. Rebuilt drain line and tested operation. Reattached plenums and sealed with mastic and hard cast. Weighed in all new refrigerant and tested system operation. Everything is working at completion of service.