Installed Payne Furnace. Installed new zoning equipment and built new supply plenums. Installed new metal collars and sealed all connections with mastic. Installed plywood overlay. Rebuilt primary drain line and installed SS2 Safety float. Cleared drain and verified operation. Replaced disconnect and whip at outdoor unit. Charged system to meet manufacturers specifications. Everything is working at completion of service.