Installed new TXV metering device. Installed new liquid line filter drier in the attic. Pressure tested system with nitrogen and pulled vacuum. Reinsulated the suction line outside. Resealed evaporator coil to ductwork. Charged AC with R-410A refrigerant to 8 degrees subcooling. Tested operation of system. Everything is working at completion of service.