-Installed a 2” pvc drain through the home’s foundation for a dedicated dry well drain for the existing water softener. An excavation company is in the process of digging the trench for the drywell. The 2” pipe has been piped through the concrete frost wall. The excavation company is going to connect to the pipe and extend it to the connection to the drywell. A drain receptacle was installed within the house, which features a check valve, air admittance valve, ptrap and air gap fitting. During a follow up visit the softener will be placed into service and a regeneration cycle. This follow up visit will be completed once the exterior piping is complete -Repaired the leaking 3” pvc drainage stack in the main floor bathroom. There was a dry fitted 3” sanitary t that connects the vent and the second floor drainage. The water from the vent was causing the fitting to leak. This connection has been replaced.