New thermostat, flush drain line, flush and pressure test copper line set, new pad with blocks outside with anchors and brackets, new disconnect box with new electrical whip, new breakers as needed, all permits and inspections are included, attention to detail is paramount. Chris Garris 727-621-0543 upon arriving at job, meet and greet with customer go over work for the day ended up having the wrong units to fit. Had to call Marques he come out ended up getting his train units to put in 2 1/2 ton straight cool new pad block pad tied down to one new train, straight cool 2 1/2 ton tiedown on top four corners new disconnect, new high voltage, whip everything secured and fasten pictures taken Work completed flush copper line set flush, drain line after tearing out air handler replace new air handler on new stand new drain pan underneath drain pan flow switch in line flow switch after flushing the line and line set and drain hook up both everything is complete after nitrogen test 400 psi ba