We will remove the damaged panel and installing new main breaker 200 and panel on its place. We will install a new service cable to replace the old damage cable to the new panel as well as to the point of attachment. We will need to replace the meter can as well. We will install a new grounding system to meet code and safety requirements which include ground rods on the outside of the house as well as main water grounding We will pull an electrical permit and coordinate county inspections as well as power company final tie in of the meter can. We will run two circuits from the new panel roughly 5 foot away and install arc fault and GFCI protection We will remove the damaged panel and installing new main breaker 200 and panel on its place. We will install a new service cable to replace the old damage cable to the new panel as well as to the point of attachment. We will need to replace the meter can as well. We will install a new grounding system to meet code and safety requirements wh