403 Headquarters Dr. Unit 5
Millersville, MD 21108
(443) 396-3797

Job Locations
for edgewater, md


Map of Edgewater MD
Nicholas T.

Nicholas T.


Job Checkin

We went and saw a new dedicated 30 amp 240 V circuit from the main panel out through the yard to the shed in the back right corner. Installation of new eight circuit 30 amp sub panel at the shed Install ground rods for new shed subpanel Install new 20 amp receptacle off of the new sub panel for a window air conditioning unit Returns today and completed quoted work. We previously had the underground company new three-quarter inch PVC line from the house to the back of the shed. We install new number 10 wire from the house to the shed and installed a new tenant space QO subpanel Inside the shed. We installed two new ground rods and tied into the shed subpanel. We also installed a new dedicated 20 amp circuit for a plug-in air conditioner inside. We also refed the shed wiring to the sub panel. We then ran PVC down the side of the home and into the main panel located in the basement. Was completed he tested all power and everything is working properly.