Arrived onsite and was shown to the dining room where she explained she would like a chandaleir. She has a sprinkler head close to the center of the table but I’m certain i can get it center. I explained the necessary drywall damage to get it done, told her about how i would do it and then we discussed the chandalier install, told putting 2 dimmers in, 1 for the new fixture and 1 for the 4 existing recess. We will return December 8th to complete all the work. -run new wiring from the existing dining room switch, up into the ceiling and cut over to where we will install a bar brace box center of the dining room table - remove the single gang switch that is currently in the wall for 4 recess, and install a 2 gang and then put the new chandelier on a dimmer, as well as switch the recess over to a dimmer also - lay plastic to protect everything in the working area. - drywall cutting is necessary for the work to be completed - once 2 gang is cut in, both dimmers installed and the prewi

Arrived onsite and was shown to the dining room where she explained she would like a chandaleir. She has a sprinkler head close to the center of the table but I’m certain i can get it center. I explained the necessary drywall damage to get it done, told her about how i would do it and then we discussed the chandalier install, told putting 2 dimmers in, 1 for the new fixture and 1 for the 4 existing recess. We will return December 8th to complete all the work.  



-run new wiring from the existing dining room switch, up into the ceiling and cut over to where we will install a bar brace box center of the dining room table
- remove the single gang switch that is currently in the wall for 4 recess, and install a 2 gang and then put the new chandelier on a dimmer, as well as switch the recess over to a dimmer also
- lay plastic to protect everything in the working area.
- drywall cutting is necessary for the work to be completed
- once 2 gang is cut in, both dimmers installed and the prewi Arrived onsite and was shown to the dining room where she explained she would like a chandaleir. She has a sprinkler head close to the center of the table but I’m certain i can get it center. I explained the necessary drywall damage to get it done, told her about how i would do it and then we discussed the chandalier install, told putting 2 dimmers in, 1 for the new fixture and 1 for the 4 existing recess. We will return December 8th to complete all the work.  



-run new wiring from the existing dining room switch, up into the ceiling and cut over to where we will install a bar brace box center of the dining room table
- remove the single gang switch that is currently in the wall for 4 recess, and install a 2 gang and then put the new chandelier on a dimmer, as well as switch the recess over to a dimmer also
- lay plastic to protect everything in the working area.
- drywall cutting is necessary for the work to be completed
- once 2 gang is cut in, both dimmers installed and the prewi