22645 83rd Ave, S Building D
Kent , WA 98032
206-772-7502

Job Locations
for seattle, wa


Map of Seattle WA
Marc P.

Marc P.


Job Checkin

Deficiency: All dry systems are due for a full wet trip- 13 systems with a average of 10 low point drains each Not very many floor drains probably going to take 2 guys a week Deficiency: Pacific place Management suite (4th flr across pike place chowder)- (33) recalled central heads. (2) recalled A1s in cooler. Coach- (27) recalled central GBs Din tai fung - 20-24 feet high (3) central A1s sidewalls in outside seating area. Have fitter determine best way to change out not sure they can get a lift to where heads are located. 19 hose PRV’s due for 5 year flow test. Marlon did the last 5 year out there confusing building recommend sending Marlon again Need Tank. 41 water gauges are over 5 years old and need replaced. 3-2.5” hose valves in stair 6A are missing and need replaced Deficiency for Dry East Dry Valve Room: East sprinkler room 6 dry systems due for full wet trip West sprinkler room 7 dry systems due for full wet trip 13 systems with a average of 10 low point drains each Not