CAME OUT FOR ESTIMATE ON EQUIPMENT. INSTALLED A 3TON HP/COIL CONVER. MADE SUR EQUIPMENT WAS INSTALLED PROPERLY. MADE SURE WORK WAS CLEANED WHEN FINISH. CHECK THERMOSTAT, CHECK AIR FILTER, CHECK CONDENSER COIL, CHECK DRAINAGE, CHECK ALL ELECTRICAL CONNECTIONS. EVERYTHING IS RUNNING GREAT.