INSTALLED 2 TON 3P PREMIUM SYSTEM. MADE SURE SYSTEM WAS INSTALLED PROPERLY. CHECK ALL ELECTRICAL CONNECTIONS, CHECK CONDENSER COIL, CHECK VOLTAGE AND AMPERAGE ON MOTORS, CHECK COMPRESSOR DELAY SAFETY CONTROLS, CHECK THERMOSTAT. MADE SURE WORK AREA WAS CLEAN WHEN FINISHED. EVERYTHING IS RUNNING GREAT.