INSTALLED A 4T XX A/H, AC. MADE SURE SYSTEM WAS INSTALLED PROPERLY, CHECK ALL ELECTRICAL CONNECTIONS, CHECK THERMOSTAT, CHECK DRAINAGE, CHECK FREON LEVELS. MADE SURE WORK AREA WAS CLEAN WHEN LEFT. EVERYTHING IS RUNNING GREAT.