Installation Package Includes: • Furnish and install stated equipment as well as all parts, materials and labor at or above manufactures specifications and local code requirements. • New Electrical Disconnect • New Electrical Whip/Power wire from disconnect/switch to new equipment • Proper Size Fuses • New Condenser Pad, level and square • Clean & Chemically Flush existing line-set • Pressure test all refrigerant connections & piping to insure the new system is free of any leaks. • Haul away all jobsite trash and old equipment Warranties: • 10 year parts • 10 year compressor • 3 year labor/workmanship