Installation of a new 40 inch 240 V line from the main panel out to the large shed in the backyard. Installation of a new subpanel inside of shed with proper grounding. Install installation of two new 240 V 20 amp lines inside of shed. Supply and install two new LED fixtures in place of the four fluorescent plug-ins. Install one new 20 amp receptacle in shed off of the new subpanel next to the subpanel.