Reset water feeder to read zero drain boiler. Found site glass to be cracked causing a leak exercise top and bottom valve on site glass. We’ll have to order new cycle glass 8 inches long. And two new grommets. Tested combustion. Clean burners, which were very rusted up and corroded. Carbon monoxide was close to 100 ppm. We may have to clean heat exchanger in the future.