824 S Central Expressway, Suite 100
Anna, TX 75409
903-482-4900

Job Locations
for van alstyne, tx


Map of Van Alstyne TX
Shelby S.

Shelby S.


Job Checkin

Upon arrival, I found that the blower motor would stop working in a call for cooling. I checked my cooling terminal and found I was getting 2v out of the control board. The motor requires 120v to run. I checked my incoming voltage and discovered the unit receiving 200v on a 120v system. I recommended that an electrician take a look at the power supply. The system is not on a dedicated power supply.

Upon arrival, I found that the blower motor would stop working in a call for cooling. I checked my cooling terminal and found I was getting 2v out of the control board. The motor requires 120v to run. I checked my incoming voltage and discovered the unit receiving 200v on a 120v system. I recommended that an electrician take a look at the power supply. The system is not on a dedicated power supply. Upon arrival, I found that the blower motor would stop working in a call for cooling. I checked my cooling terminal and found I was getting 2v out of the control board. The motor requires 120v to run. I checked my incoming voltage and discovered the unit receiving 200v on a 120v system. I recommended that an electrician take a look at the power supply. The system is not on a dedicated power supply.