Returned to home Prepped handler Pumped down refrigerant Removed filter drier Installed new filter drier Removed TXV Installed new TXV Pressure tested with nitrogen Evacuated to 510 microns Installed clean outs on drain lines Flushed drains Started system Added refrigerant until gained proper sub cool Temp split/pressures/SC and amps all good *installed customer supplied start kits and capacitors (no warranty)