Installed condensing unit. Leveled new pad. Installed new whip and disconnect box out side. Welded line sets. Pressure tested and vacuumed lines out down to mandatory microns. Insulated new lines. Hooked up R32 detection sensors. Ran drain line. System is ready for operation. No charge due to work from initial install sale.