We will run a new dedicated 60A circuit for the main panel through the unfinished basement and out of the front of the home. We were trying roughly to your foot from the front of the Home over to the retaining wall in the driveway. We will punch through the driveway and install customer supplied hardwired level two ChargePoint charger.