Today, I arrived on site to perform winter maintenance on the HVAC equipment. Overall Equipment Condition: * Good condition noted for both indoor and outdoor units. Indoor Unit Details: * Located in the attic closet. * Air handler servicing the downstairs area. * Filtration system checked and replaced with customer-provided pleated 1" filters (size 20x25). * Indoor coil inspected and found to be clean and in good condition. Outdoor Unit Details: * Located on the side of the house as a heat pump. * Outdoor coil also inspected and confirmed to be clean and in good condition. Electrical Components: * All tested components are functioning properly within manufacturer specifications: * Blower Motor * Heat Strip Kit * Condenser Fan Motor * Compressor * Blower Run Capacitor * Compressor Run Capacitor * Fan Run Capacitor * Contactor * Defrost Control Board * Electrical Wiring System Inspections: * Blower Wheel, Electrical Wires, Primary Drain Pan, and Secondary Drain