Today I arrived on site and performed a summer time maintenance on your HVAC equipment. **Indoor Unit (Air Handler):** * Located in the attic/garage. * Verified the overall equipment condition as good. * Checked the pleated 1" filter (size 20x20x1). * Observed the indoor coil in fair condition. **Outdoor Unit (Heat Pump):** * Located on the side of the house. * Determined the outdoor coil to be in good condition and cleaned it. **Electrical Components:** * Tested and confirmed proper operation within manufacturer specifications for: * Blower Motor * Condenser Fan Motor * Compressor * Compressor Run Capacitor * Fan Run Capacitor * Contactor * Electrical Wiring **System Components:** * Inspected and verified good working condition of: * Blower Wheel * Secondary Drain Pan * Primary Drain Pan * Electrical Wires Secured * Ductwork **Condensate Drain System:** * Cleared the drain line. * Cle