Today I arrived on site and performed a summer time maintenance on your HVAC equipment. **Indoor Unit (Air Handler - Crawl Space, East Side):** * Checked the pleated 1" filter (20x25x1). Customer will provide their own filters. * Confirmed the indoor coil was clean. **Outdoor Unit (Heat Pump - Side of House):** * Verified the outdoor coil was clean. * Confirmed proper operation of the blower motor, condenser fan motor, compressor, compressor run capacitor, fan run capacitor, contactor, and electrical wiring. * Inspected and confirmed the blower wheel, primary drain pan, and electrical wires were secured. **System Performance:** * Measured a return air temperature of 73.0°F and a supply air temperature of 57.0°F. * Cleared the condensate drain line and cleaned out the primary pan. **Additional Actions:** * Dusted the thermostat and restored power to the units. * Tested the operation of the thermostat. Quincy, FL View visual findings from today’s job here - ht