Upon evaluation of the system, wiring for the master bedroom and upstairs heating loops was found to be incorrectly connected at the basement controls. The wiring was reorganized and properly terminated in the correct locations. Once corrected, all heating zones responded appropriately and began heating as designed. The system was monitored in operation for approximately 20 minutes to ensure proper circulation and reliable performance.