The existing copper water line was cut out and approximately 20 feet of new copper piping was installed in its place. All new piping was properly measured, fitted, and securely soldered to ensure tight, leak-free connections. The water line was carefully reconnected to the existing system and supported with new hangers installed at appropriate intervals to provide proper alignment and long-term stability. Upon completion, the system was pressurized and thoroughly tested to verify proper operation, with no leaks observed and normal water flow restored.