-For this job I met with the homeowner to discuss the opportunity to install the rough in and finish plumbing for one bathroom in the house. A septic is planned for early spring. The house is already plumbed with water, it needs to be extended to the bathroom. Estimate will be presented via email -We discussed the opportunity for a future bathroom in the shop and the apartment above the shop. A building drain will be installed in the shop when the septic is installed. Once the location of the shop drain is verified an estimate to plumb the shop bathroom will be presented.