CAME OUT FOR ESTIMATE ON EQUIPMENT. INSTALLED 3 TON FURN PREM ERSA; MADE SURE EQUIPMENT WAS INSTALLED PROPERLY AND WORK AREA WAS CLEAN WHEN FINISH. CHECK THERMOSTAT, AIR FILTER, AIRFLOW, GAS PRESSURE, AND ALL ELECTRICAL CONNECTIONS. EVERYTHING IS RUNNING GOOD.