ESTIMATE FOR EQUIPMENT. INSTALL 1.5T AND 3T AC FURNACE AND COIL, 12Y. CHECK BURNER OPERATION, HEAT EXCHANGER, GAS PRESSURE, VENTING, AND ALL ELECTRICAL CONNECTIONS. CHECK THERMOSTAT, AIR FILTER, AIRFLOW, FREON LEVELS, AND DRAINAGE. EVERYTHING IS OPERATING GOOD.