INSTALL 2.5T XX A/H. MADE SURE SYSTEM WAS INSTALLED PROPERLY. CHECK ALL ELECTRICAL CONNECTIONS, CHECK THERMOSTAT, CHECK AIR FLOW, CHECK DRAINAGE. MADE SURE WORK AREA WAS CLEAN WHEN LEFT. EVERYTHING IS RUNNING GOOD.