INSTALLED A 3.5 TON A/C & COIL AND 4TON A/C & COIL. MADE SURE SYSTEMS WERE INSTALLED PROPERLY. CHECK ALL ELECTRICAL CONNECTIONS, CHECK THERMOSTAT, CHECK FREON LEVELS, CHECK VOLTAGE AND AMPERAGE ON MOTORS. MADE SURE WORK AREA WAS CLEAN WHEN LEFT. EVERYTHING IS RUNNING GREAT.