INSTALLED 4T XX D-FLOW. MADE SURE SYSTEM WAS INSTALLED PROPERLY. CHECK AIR FLOW, CHECK THERMOSTAT, CHECK ALL ELECTRICAL CONNECTIONS, CHECK DRAINAGE. EVERYTHING IS RUNNING GOOD. MADE SURE WORK AREA WAS CLEAN WHEN LEFT.