Scheduled with Joe 908-461-0975 Project scope to include: -Permit submittal package with (manufacturer) ANSUL pre-engineered design and blueprint -All required equipment for modification and design -All required pipe and fittings for installation, chrome sleeving on exposed piping -Labor to install design
Preformed annual fire extinguisher inspection all fire extinguishers are in the green and no damage