Supply and installation of a new 50-gallon, 4500-watt Rheem medium-profile electric water heater, complete with drain pan. Installation of an expansion tank on the new water heater to accommodate thermal expansion. Option 1: Removal of the existing ¾" gate valve located on the right side of the home, to be replaced with a new ball valve and pressure relief valve. Option 2: Gate valve remains in place; only the expansion tank is installed with the new water heater. Needs to be permitted.
Upon arrival, I replaced two separate flappers and one minor toilet rebuild as per video taken. All toilets were tested and in proper working condition.. also upon completion, I re-pressurize the house with the pressure gauge to ensure there is no more leaks. I could not get a hold of customer, but by my conversation yesterday that she wanted me to leave the water off to the house since nobody is living here. I could not get a hold of customer to collect payment, but she has an account so I sent the email invoice payment link.
CCN : 2F63-H7AH SN: AH1118251768 BSI 09.20 YEARLY
On arrival, building manager yana met us at lobby along with maintenance guy Jose, in which they described the scope of work needed along with the issues into which are leading into the building constantly having stoppages in mainline branch affecting 1st floor units.after a walkthrough and layout of areas we proceeded with providing an estimate in areas they wanted to work on first due to severity of issue.she also established that they have a master plumber that will be doing all the underground in sections per unit if needed be however he does not have camera among other special machinery needed to professionally and properly clean sanitary system to identify conditions of lines. Sent estimate I’m which she will call me by Friday with final decision since they will hold a meeting with board by then.
I provided an estimate for a tub shower conversion. I informed customer that we are not responsible for replacement of tile and I forwarded their information to John from intrusted. At this time, customer needs to get the cost from entrusted in order to sign our estimate.
CCN : 2S98-A3UQ SERIAL # : 08874 DUE 04/16 YEARLY
BACKFLOW CCN : 2F63-H7AH SN: AH1118251768 BSI 09.20 YEARLY
Annual backflow certification required by Broward County through BSI Tested, certified, filed and fees paid to BSI CCN #2S98-A3UQ Serial # 08874