2 system pm 2nd visit-Checked operations of systems. Replaced filters, checked capacitor outputs and amp drawls, checked refrigerant levels and auxiliary heat, triggered safety switches and defrost modes, and cleared drain lines. Systems are operating properly at this time. 2-20x25x4 still clean. Bring filters for the cooling visit.