1 system PM 2nd visit- Checked heating operations of system. Replaced 16x25x5 filter, checked capacitor outputs and amp drawls, Inspected heat exchangers, Checked delta T, triggered safety switches, cleaned flame sensor, cleaned burners, and cleared drain line. system is operating properly at this time. Pics uploaded Sending invoice to email for payment