Replacement of main level furnace pressure switch. Labor only OEM part is being shipped from trane. Also cleaned out drain and water from flue pipe. Allowed system to run for over 30 minutes with no issues. System is now operating properly. If water buildup happens again, it’s possible that Sheetrock will have to be cut to figure out where water is collecting.