824 S Central Expressway, Suite 100
Anna, TX 75409
903-482-4900

Job Locations
for melissa, tx


Map of Melissa TX
Brayden W.

Brayden W.


Job Checkin

1. Visually inspected condenser coil for debris/ dirty. 2. Inspected condenser fan motor. 3. Inspected condenser fan blades. 4. Inspected/ cleaned wiring connections. 5. Tested compressor/ condenser fan motor capacitor. 6. Checked compressor amp draw- inconsistent over amping advised hard start kit/soft start kit to reduce wear and tear on unit 7. Checked condenser fan motor amp draw. 8. Inspected return filter- homeowner would like to change themselves in a month 9. Inspected return plenum for debris 10. Measured temperature differential from supply to return. 20 degrees measured. 11. Inspected drain lines and treated to prevent blockages and treated 12. Rinsed condenser unit to promote heat exchange All is well unit regards to normal unit operation. Unit in good working order upon departure.

1. Visually inspected condenser coil for debris/ dirty.
2. Inspected condenser fan motor.
3. Inspected condenser fan blades.
4. Inspected/ cleaned wiring connections.
5. Tested compressor/ condenser fan motor capacitor.
6. Checked compressor amp draw- inconsistent over amping advised hard start kit/soft start kit to reduce wear and tear on unit
7. Checked condenser fan motor amp draw.
8. Inspected return filter- homeowner would like to change themselves in a month
9. Inspected return plenum for debris
10. Measured temperature differential from supply to return. 20 degrees measured.
11. Inspected drain lines and treated to prevent blockages and treated
12. Rinsed condenser unit to promote heat exchange
All is well unit regards to normal unit operation. Unit in good working order upon departure. 1. Visually inspected condenser coil for debris/ dirty.
2. Inspected condenser fan motor.
3. Inspected condenser fan blades.
4. Inspected/ cleaned wiring connections.
5. Tested compressor/ condenser fan motor capacitor.
6. Checked compressor amp draw- inconsistent over amping advised hard start kit/soft start kit to reduce wear and tear on unit
7. Checked condenser fan motor amp draw.
8. Inspected return filter- homeowner would like to change themselves in a month
9. Inspected return plenum for debris
10. Measured temperature differential from supply to return. 20 degrees measured.
11. Inspected drain lines and treated to prevent blockages and treated
12. Rinsed condenser unit to promote heat exchange
All is well unit regards to normal unit operation. Unit in good working order upon departure.