824 S Central Expressway, Suite 100
Anna, TX 75409
903-482-4900

Our Top Cities


Job Locations
for plano, tx


Map of Plano TX
Matthew C.

Matthew C.


Job Checkin

-Contactor -Turbo Multi Use Capacitor 3 - 5-2-1 Hard Start Kit We preformed cooling maintenance on 4 single gas systems. Upon arrival client stated that the main down stairs unit was possibly low on Freon and wasn’t keeping up. We tested all electrical components on the inside units. All electrical components inside tested within manufacturer specifications. Supply temps for the master bedroom, second downstairs living area and upstairs was 55 degrees. The downstairs unit that was in question supply temperature was 61. We proceeded outside to test all electrical along with run and start amps on all the units. The master bedroom and the upstairs electrical components were testing within manufacturer specifications, but were testing high on start amps. The downstairs second living area electrical components were testing outside of manufacturer specifications and starting on high start amps. The downstairs main areas electrical components were testing within manufacturer specifications.

-Contactor
-Turbo Multi Use Capacitor
3 - 5-2-1 Hard Start Kit 

We preformed cooling maintenance on 4 single gas systems. Upon arrival client stated that the main down stairs unit was possibly low on Freon and wasn’t keeping up. We tested all electrical components on the inside units. All electrical components inside tested within manufacturer specifications. Supply temps for the master bedroom, second downstairs living area and upstairs was 55 degrees. The downstairs unit that was in question supply temperature was 61. We proceeded outside to test all electrical along with run and start amps on all the units. The master bedroom and the upstairs electrical components were testing within manufacturer specifications, but were testing high on start amps. The downstairs second living area electrical components were testing outside of manufacturer specifications and starting on high start amps. The downstairs main areas electrical components were testing within manufacturer specifications.