Upon arrival, I found the system fully operational and satisfied. I cycled the system on and checked my electrical and refrigerant pressures. According to the charge chart, the system needs a top off on 454B. Customer is not available until 8/19/25. Scheduled for installers to come back on 8/19/25 at 8am. We will call and confirm appointment on 8/18/25.