The boiler supply was re-piped to include a main air elimination device, and the failed expansion tank was relocated to the wall adjacent to the boiler. This work was completed to address the air entrapment occurring in the water heater zone and to reduce air-related issues throughout the system. Upon completion, all heating zones were verified to be circulating properly, and the system was purged to ensure all air was removed.