Removed the existing boiler and manifold. Installed a new Peer Pro Advantage oil-fired boiler, including new supply and return manifolds. Connected the new boiler to the existing zone piping. Installed a new smoke pipe to the existing chimney connector and added a draft regulator to the flue piping. Ran a new oil supply line from the oil tank to the boiler due to leakage in the previous line. Installed a spin-on oil filter and flexible oil line compatible with the new boiler. Relocated and wired a new Firomatic safety valve for the boiler. Performed full boiler startup, including verification of oil pump pressure and pump cutoff. Checked all system safeties and conducted combustion and draft testing. Confirmed the boiler is operating within manufacturer specifications. Verified proper operation of the high-limit control and the water heater aquastat to ensure system shutdown upon satisfaction; both operated correctly. Reviewed new system safeties and operation with the customer. At

Removed the existing boiler and manifold. Installed a new Peer Pro Advantage oil-fired boiler, including new supply and return manifolds. Connected the new boiler to the existing zone piping. Installed a new smoke pipe to the existing chimney connector and added a draft regulator to the flue piping.

Ran a new oil supply line from the oil tank to the boiler due to leakage in the previous line. Installed a spin-on oil filter and flexible oil line compatible with the new boiler. Relocated and wired a new Firomatic safety valve for the boiler.

Performed full boiler startup, including verification of oil pump pressure and pump cutoff. Checked all system safeties and conducted combustion and draft testing. Confirmed the boiler is operating within manufacturer specifications.

Verified proper operation of the high-limit control and the water heater aquastat to ensure system shutdown upon satisfaction; both operated correctly. Reviewed new system safeties and operation with the customer. At Removed the existing boiler and manifold. Installed a new Peer Pro Advantage oil-fired boiler, including new supply and return manifolds. Connected the new boiler to the existing zone piping. Installed a new smoke pipe to the existing chimney connector and added a draft regulator to the flue piping.

Ran a new oil supply line from the oil tank to the boiler due to leakage in the previous line. Installed a spin-on oil filter and flexible oil line compatible with the new boiler. Relocated and wired a new Firomatic safety valve for the boiler.

Performed full boiler startup, including verification of oil pump pressure and pump cutoff. Checked all system safeties and conducted combustion and draft testing. Confirmed the boiler is operating within manufacturer specifications.

Verified proper operation of the high-limit control and the water heater aquastat to ensure system shutdown upon satisfaction; both operated correctly. Reviewed new system safeties and operation with the customer. At