Replaced failed ultimate boiler with new Peerless oil boiler. Replaced air scoop, expansion tank, and venting. Rehooked to existing manifold and electrical components. Pumped 10 gallons of 50 50 mix glycol into system. Ensured proper operation of system, performed combustion test. Will have to return after chimney work is done to re calibrate boiler.